Determine where you will install furring strips along your block walls.
How to glue drywall to concrete block wall.
Cut the nozzle end of a tube of construction adhesive at a 45 degree angle using a utility knife.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make.
Add some rigid board insulation between the hat.
Using a scraper scrape off chunks of debris from the wall to make it as smooth as possible.
How to attach drywall to concrete block step 1.
The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
Center a strip.
How to adhere drywall to a concrete block 1.
The strips should be roughly 16 to 24.
You can use standard 2 x 4 boards and strong adhesive to create a wooden framework to which you can easily attach your paneling.
Cut enough furring strips from 1 by 3 inch lumber with a circular saw to allow you to space them 16 inches apart for.
Frame out the rest of the wall by adding faux top and sole plates dropping the top a bit for a drop ceiling if.
An alternative to gluing your paneling directly to the walls is to glue wooden studs to the walls and then attach the paneling to the studs.
Here are some tips to.
Find a mark for.
How to glue drywall to the interior of concrete block walls step 1.
First draw a plumb line to make sure the hat channels will be spaced properly for the size of drywall and insulation you re using.
One common technique is to cover the block wall with drywall.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Make marks on the wall that are 16 inches apart starting at one end and working toward the other.