Installing the rolled roofing 1.
How to install roll roofing shingles.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
It also helps if you first install a layer of roofing felt.
Snap a chalk line as a guide for the first layer roofing.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Use a trowel to scoop up the roofing cement.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Drip edge or drip cap is either plastic or sheet metal.
Mark a chalk line to identify the end of your first layer.
For extra durability you may install roll roofing in two layers.
The strips should always be horizontal.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Repeat this on both sides of the roof.
To seal a plumbing vent spread roofing.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Apply roofing cement to the roof.
Every 5 inches make a new mark until you get to the rop of the roof.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Install peel and stick roofing in a similar manner.
Cut the rolled roofing.
How to do it attach first course.
It not only protects the roof but it also protects the fascia.
Plan so that no two butt joints are closer than 2 feet from each other.
Do not use the eaves as a guide instead because they can be uneven.
Spread the roofing cement along the.