If necessary you can easily cut and form shingles to fit your particular roof.
How to install rubber roofing.
The fastener plates sit slightly proud of the surface so when the epdm is installed the plates are easy to see through the rubber.
Install the roofing screws vertically along each rib in the panel.
Place the first screw about 7 inches from the bottom and each subsequent screw about 18 to 24 inches apart along the vertical run.
One piece rubber roof fully adhered.
The foam board is attached to the roof deck with screws and large metal plates which are also available through roofing suppliers.
Step 2 roll out rubber membrane.
Secure the screws but do not overtighten.
Begin installing the rubber roof shingles with nails beginning with the starter strip the strip on the lower edges of your roof in straight rows overlap the shingles until you reach the peak of your roof.
After you ve made the necessary adjustments to the roll and cut it to the shape of your roof sweep your roof to remove all dirt dust and debris and then apply the adhesive.
Rubber roof repair kit available on amamzon.
The washer under the screw head should seal to the surface of the panel without bulging or shifting.
Remove any loose shingles.
Repeat this process with the other half of the rubber roof.
This is the type of system i like to install best one of the key strengths of a rubber roof is the lack of joints and therefore potential leaks epdm rubber membrane can be cut to virtually any size from one piece without joins up to 15m x 30m.
Apply the adhesive to both the materials of the rubber roof and the roof itself by using a roller.
Before doing anything with your rubber roof take the time to thoroughly clean the roof.
Then install the rubber roof cap shingles.
Step 1 clean off the roof.
You need one fastener per every 2 square feet.
Fold back half of the rubber membrane and use a roller to apply a thin layer of glue or whichever adhesive your roof manufacturer specifies to the deck.
Step 3 apply adhesive.
Carefully fold back the rubber membrane over the section and roll flat.
Roll out the rubber across the adhesive trim where necessary and check for air bubbles.
Don t apply the adhesive to a border around the edge of the deck.