These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
How to install torch on roofing felt.
Overlap each row at least 3 to 4 inches.
Cold process modified bitumen roll roofing is another way to apply rolled roofing other than hot mopping or torching.
Also cover up with long sleeved clothing to reduce the chances of an accident.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
These applications are ideal for flat roofs or protective surfaces under roof level decks.
Some roofing felts are actually glued down.
Fasten drip edge on eaves with.
Installing the roofing felt does take care but can go very quickly.
Choose heat resistant gloves and boots made of a material like kevlar.
You will need to use your gloves and boots on occasion to roll or press down on the bitumen sheets as they bubble.
The term cold applied is referring to o.
If you live in an area with inclement weather you should consider using a special ice and water protector.
This will help you get started and you will also learn some tricks.
Watch this video if you want to learn how to use a propane torch on a flat roof.
Start by laying asphalt felt or other underlayment over the roof.
Installing the torch down roofing involves flames and melted asphalt.
Install new flashing metal flashing is often called drip edge along the.
Installing roof felt is a two person job.