Metal roofing is not as heavy as its counterparts.
Install metal roof on deck.
For exposed fasteners avoid over tightening the fastener.
This is usually because low quality leak prone decking materials such as epdm rubber are used often in an effort to save money.
Our experts can take care of all this and more.
These roofs are usually easy to install over a deck or patio just make sure you re not breaking any local building codes.
Screw these boards into the 144 inch boards perpendicularly.
Discuss the following issues with your professional handyman during the deck roof design process.
Since it is quite light it will be easy for you to install it.
Lower than the purlin along the house 12 x 1 4 3.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Place the first screw.
These boards are the roof support boards.
Unfortunately many homeowners who have a flat deck roof have to deal with frequent leaks.
Use 2 inch wood screws.
On average 300 sq ft.
Then stretch a string between them.
You can use 1 inch nails for the installation of eave flashing.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Although the initial cost could burn a hole in your pocket it is still worth installing since its durability will not make you to replace it soon meaning you have the chance to salt away some money.
You are essentially sealing off the metal roof with this flashing and you need to make sure that is securely fastened.
Install the purlin along the house and the outer purlin.
Next you are ready to install the metal roof.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Use your neoprene washer head screws to secure the metal to the sheathing.
If the span under your deck is 12 ft for example the purlin at the outer end of the deck should be 3 in.
First mark all the purlin locations on the deck joists.
A metal deck roof will add shade and make your deck or patio space more comfortable during the hot summer months.
Attach a 96 by 6 by 1 inch pine board to each chalk line on the 144 inch boards connecting the two 144 inch boards.
If you have an existing deck it s possible to add a roof to it by installing additional supports.
The best time to build a roof over your deck is during the construction of the deck itself.
Space the screws about 12 in 30 cm apart.
The eave flashing or edging is just the steel metal strips used to cover the entire perimeter of the roof.