Remove old shingles and.
Install roof shingles properly.
Install a starter strip.
It generally takes three bundles of shingles to cover 100 square feet.
Snap horizontal chalklines to help you keep the courses straight.
Arrange the shingles so the ends and the tab notches do not lie directly above gaps in the shingle below.
Using your staple gun secure the felt to the roof.
Measure the length of a shingle as it lies across the roof.
Continue this all the way to the end of the roof.
Using the chalk line snap a line between the two marks to get a straight edge.
If possible have the shingles delivered via a boom directly onto the roof.
Step one in any roofing project is always safety first.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
How to install asphalt shingles 1.
Asphalt roofing shingles simply rely on the force of.
How to do it prep work space.
Get the right number of shingles for the job.
Install new flashing metal.
First snap a line for the top of the.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the.
Pull the drip edge down about a half inch from that line to.
Preparing the roof 1.
This will help determine how the shingles will lay on the.
Start at the left side of the ridge and nail the first shingle on the right side.
If the gaps lined up water could get directly onto the roof sheathing and then seep in through a nail hole.
Working at heights on a roof presents fall hazard risks and.
Lay the next cap shingle over the first so it covers that nail and nail it in the same way on the left side.
Understand the physics of how a sloped shingle roof works.
Installing roof shingles in 11 steps.
Install shingles from the lower left corner working to the right and also working up the roof slope.
Overlap each row at least 3 to 4 inches.