Tri built underlayment shall be installed using compatible materials and conform to best building practices.
Install tri built flat roofing.
Tri built has become a recognized and trusted leader in the construction industry by focusing on professional contractors.
Tri built synthetic underlayment can save you time and money with less material damage and fewer post install repairs.
Cra rio remove existing roofing shingle and install 5v metal roof.
Tri built roof x tender cool roof coatings duration.
Nail in place before applying the base ply.
Stay on track take on more jobs and sleep assured knowing your tri built synthetic underlayment projects will remain intact.
Take photos of the finished roof installation for future reference.
Surecoat systems 726 780 views.
Remove existing modified on flat roof and install new peel stick modified.
When light metal wall ties or other structural metal are exposed on top of the wood deck cover them with a heavy ply of roofing membrane such as inverted tri ply bur granule cap sheet extending 2 6 51 152 mm beyond the metal in all directions.
Consult with your local sales repre sentative for further information.
Verify the application is compliant with applicable building codes.
App torch smooth 1 sq.
As with all roofing materials always observe safe roofing.
Granular surface self adhering ice water shield 2 sq.
Priming is generally not required but is recommended over dens deck concrete or masonry substrates or in coldweather.
How to install elastomeric roof coating flat roofs duration.
3 x 65 smooth seal ht underlayment.
36 15 astm d4869 felt 432 sq.
Prime with tri built quick dry primer or appropriate primer applied as per application and handling guidelines outlined in.
Roof proof hybrid underlayment 4 5 sq.
Tri built underlayment is not designed or intended to be the final or primary roof.
Roof lays flat fix fishmouths replace broken or scuffed shingles shingles are sealed down flashings are secure with the homeowner check out the roof and the grounds get his her approval before leaving photos.
If the existing siding is damaged remove it and install tri built fanfold underlayment directly to the substrate.
Install the new siding material over tri built fanfold underlayment in.
Unlike traditional asphalt saturated felts tri built synthetic.
On re roofing applications remove old shingles nails and other loose materials.