Always make sure that your installation is thermally insulated and weatherproofed according to the requirements of your particular application.
Installing heat trace on roof.
Starting at the bottom left or right edge corner of the surface near the gutters apply clips to the third or fourth row of shingles approximately eight to twelve inches apart.
For dome drains on roof trace the roof around the dome drain in a 5 pointed star pattern about 18 inches out from the center of the dome then enter the drain about 2 feet and come back out of the drain.
When installing roof and gutter heat trace on a commercial building there are several key considerations to ensure proper installation.
Clip the starting point of the cable to a.
Route the cable from the electrical outlet to the starting point on the roof.
Run the cable back.
There is more to heat trace than meets the eye.
Secure the cable to the shingle with one of the provided cable clips.
Install roof heater cables when it s dry outside and it s safe to do the work from a ladder.
For roof drains leading into a heated area a loop of heating cable is installed to a typical depth of 2 feet.
Use a run of heater cable in the gutter.
If you don t have a gfi grounded outlet you may need to hire an electrician to put one close by.
Refer to page 8 for design options standard 4 6 gutters use 1 run of heat trace cable in gutter.
Do not clamp the heating cable with the support but place the heating cable over the support.
Step 1 apply shingle clips to install roof heating cables you must first apply shingle clips to the structure.
How to install heat tape deicier cable on your roof for eaves and gutters and downspouts for snow and ice removal.
As you prepare to install roof and gutter heat trace on a commercial building gfep ground fault equipment protection must always be used as it is an nec code requirement.
How to melt ice and snow on your eaves an.
Membrane roof pv tpo epdm etc use belt loop approach attach with adhesive.
Here are the basic steps for installing new heat cable along a roof eave and gutter.