Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto the roof.
Installing new roof drip edge.
You may need to nail through the starter strip into the drip edge.
4 deep nail the drip edge to the sheathing every 16.
Once free slide the drip edge out and discard.
You ll need to ask another roofing professional to hold up the shingles while you do so.
On the rakes the drip edge goes over the membrane so the roofers apply the membrane first.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Place a nail at one end then the other.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Secure the drip edge with roofing cement.
If it doesn t pull the drip edge out slightly from under the shingles.
On the eaves the peel and stick goes over the drip edge though there is some argument in the industry as whether this is the best way to install drip edge.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
How to install a drip edge.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
The drip edge is nailed in place using 1 1 2 galvanized roofing nails.
Make sure the outer edge extends over the gutter.
How to install drip edge flashing to a new roof.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Install the new drip edge as described above with cement and nails.