Multiply the width by the height for the.
Installing tar paper for metal roof.
The slip sheet helps keep the metal from sticking to the felt paper while installing the roof.
Join lengths at corners where the roof changes direction by cutting the part of the drip edge that sits on the.
Use a ladder to reach the bottom level of the roof.
The purpose of our channel is to create informational videos.
Most codes and good roofing practice would require felt.
To protect your home install a protective layer of tar paper also called roofing felt before placing tile metal slate or wood shingles.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Always begin working at the point with the longest peak to eave distance.
New polymer underlayments sheets are thinner and easier to work with than layers of tar paper and rosin paper.
With this video ou.
There is also another option for metal roofing underlayment.
40x60 metal building do you put tar paper under metal roofing.
Install the drip edge tightly against the edges of the plywood sub roofing so that it hangs down over the fascia.
If you re using an ice or water shield place this first and then install the tar paper.
Take care the first piece is aligned precisely perpendicular square to the edge.
Measure the width and height of each section separately.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Begin your first row of tar paper with the bottom of the tar paper.
Add the metal panels.
Step 1 measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
How to install a drip edge tar paper step 1.